Structural steel · Braga · 2023

Charles Dupuis

In this project in Paris, France, we were responsible for the study, structural design, fabrication and installation of a structural steel framework to support courtyards and a lift.

We developed the solution in S275JR steel, using approximately 12 tonnes of steel and 400 m² of steel grating. The structure was designed to ensure strength, stability and functionality, meeting the technical requirements of an intervention in an urban environment.

The finish included metallisation and RAL 6020 paint, providing increased protection of the steel and appropriate visual integration into the project.

Technical details

Material

Aço S275

Finish

Metallisation + RAL 6020 paint

Services involved

  • Structural steel
  • Steel fabrication