In this project in Paris, we were responsible for the study and fabrication of a metal mezzanine for the rooftop of a building.
We developed the structure in S275JR steel, using IPE and HEA sections, with the integration of steel grating and metal balustrades. The solution was designed to create a strong, safe and functional elevated area, suitable for the technical requirements of the space.
The finish was carried out in RAL 7016, ensuring protection of the metal structure and a discreet, contemporary appearance aligned with the architectural context of the project.
Technical details
Material
S275JR
Finish
RAL 7016
Services involved
Gallery
Technical details
Material
S275JR
Finish
RAL 7016
Services involved