In this project in Thionville, France, we manufactured balustrades and cornices for the deck of a bridge.
The project involved approximately 900 linear metres of balustrades and cornices, with a structure manufactured in S275JR steel and approximately 40 tonnes of material. The solution was developed to ensure strength, safety and durability for an infrastructure subject to intensive use and outdoor exposure.
The finish included hot-dip galvanizing and powder coating, ensuring a high level of corrosion protection and a more durable and uniform final finish.
Technical details
Material
S275JR
Finish
GALVA + RAL
Services involved
Gallery
Technical details
Material
S275JR
Finish
GALVA + RAL
Services involved