Skip to main content

Grande Forja

Bridge · Thion Ville · 2024

Thion Ville

In this project in Thionville, France, we manufactured balustrades and cornices for the deck of a bridge.

The project involved approximately 900 linear metres of balustrades and cornices, with a structure manufactured in S275JR steel and approximately 40 tonnes of material. The solution was developed to ensure strength, safety and durability for an infrastructure subject to intensive use and outdoor exposure.

The finish included hot-dip galvanizing and powder coating, ensuring a high level of corrosion protection and a more durable and uniform final finish.

Technical details

Material

S275JR

Finish

GALVA + RAL

Services involved

  • Steel fabrication

Gallery

Technical details

Material

S275JR

Finish

GALVA + RAL

Services involved

  • Steel fabrication